Can I Set Up a Bathtub Myself? Factors to Consider As Well As Steps

Top Article

Just how do you feel about A Step-by-Step Guide to Installing a Bathtub?


Tools You Need to Install a New Bathtub
Setting up a bathtub isn't exactly rocket science, but it does require solid plumbing, carpentry, and also occasionally, tiling abilities. Changing an old tub with a new one is likewise a moderately hard task. If the old bathtub is conveniently accessible, the project can move quickly; if you need to open up a wall surface to get rid of the old bathtub and also place the brand-new bath tub, the job is a lot harder. In either situation, the job is within a house handyman's abilities, although you will need an assistant to vacate the old bathtub as well as embeded in the new one. Ensure you have qualified yourself for the job and fit trying it. As opposed to employing a professional to take over a halfway-completed project, it is better to consider using one prior to you start. Possibilities are you may require a specialist plumber to make tube links.
This post will help you install a brand-new tub in your restroom if you have currently gotten a new tub and do not require to alter the arrangement of your previous water pipelines.
Your tools and product list ought to comprise the following:
  • New Bath tub
  • Hammer

  • Pipeline Wrenches

  • Prybar

  • Safety Glasses

  • Level

  • Pliers

  • Flexible Wrench

  • Putty Blade

  • Screwdriver

  • Cold Chisel

  • Measuring tape

  • Pipeline Caps


  • Getting ready for the Installment


    First of all, the supporting structure supplied with the bath needs to be fitted (if needed) according to the producer's guidelines. Next off, fit the taps or mixer to the bath tub. When fitting the tap block, it is necessary to ensure that if the faucet includes a plastic washing machine, it is fitted in between the bath and also the taps. On a plastic bathroom, it is likewise sensible to fit a sustaining plate under the taps device to avoid strain on the tub.
    Fit the flexible faucet connectors to the bottom of both taps making use of 2 nuts as well as olives (sometimes provided with the tub). Fit the plug-hole electrical outlet by smearing mastic filler round the sink outlet opening, and then pass the electrical outlet through the hole in the bathroom. Use the nut provided by the manufacturer to fit the plug-hole. Check out the plug-hole outlet for an inlet on the side for the overflow pipeline.
    Next, fit completion of the flexible overflow pipe to the overflow outlet. Afterwards, screw the pipe to the overflow face which need to be fitted inside the bath. See to it you use every one of the supplied washing machines.
    Attach the trap to the bottom of the waste electrical outlet on the bathtub by winding the string of the waste electrical outlet with silicone mastic or PTFE tape, as well as screw on the catch to the outlet. Link all-time low of the overflow tube in a similar manner.The bathroom should now prepare to be fitted in its final placement.

    Removing Old Taps


    If you require to change old taps with new ones as a part of your installment, then the first thing you must do is separate the supply of water. After doing so, switch on the faucets to drain any type of water continuing to be in the system. The process of eliminating the existing faucets can be quite troublesome due to the restricted accessibility that is often the situation.
    Make use of a container wrench (crowsfoot spanner) or a tap tool to reverse the nut that attaches the supply pipes to the taps. Have a fabric all set for the remaining water that will come from the pipelines. When the supply pipelines have actually been gotten rid of, use the exact same device to loosen up the nut that holds the faucets onto the bath/basin. You will need to stop the solitary faucets from transforming during this process. When the faucets have actually been gotten rid of, the holes in the bath/basin will certainly have to be cleaned of any type of old securing substance.
    Prior to going on to fit the new taps, compare the pipe connections on the old faucets to the brand-new faucets. If the old faucets are longer than the brand-new faucets, after that a shank adapter is required for the new taps to fit.

    Installing the Tub


    Utilizing both wood boards under its feet, put the bath tub in the called for placement. The wood boards are handy in equally spreading out the weight of the bath tub over the area of the boards instead of focusing all the weight onto four small points.
    The next goal is to ensure that the bathtub is leveled all round. This can be achieved by checking the level and readjusting the feet on the bath tub till the level reviews degree.
    To mount faucets, fit all-time low of the outermost versatile tap connector to the suitable supply pipeline by making a compression sign up with; then do the exact same for the other tap.
    Switch on the water supply and examine all joints and also brand-new pipework for leaks and tighten them if necessary. Fill the bath tub as well as likewise inspect the overflow outlet and the normal electrical outlet for leakages.
    Lastly, repair the bath paneling as defined in the supplier's user's manual. Tiling and securing around the tub ought to wait until the bathtub has actually been utilized a minimum of once as this will certainly resolve it into its final placement.

    Fitting New Touches


    If the tails of the brand-new taps are plastic, then you will certainly need a plastic connector to stop damages to the thread. One end of the connector fits on the plastic tail of the faucet as well as the other end gives a link to the existent supply pipelines.
    If you require to fit a monobloc, then you will certainly need decreasing couplers, which connects the 10mm pipeline of the monobloc to the conventional 15mm supply pipe.
    Next off, position the tap in the placing hole in the bath/basin ensuring that the washing machines are in area between the tap and also the sink. Protect the faucet in position with the manufacturer given backnut. When the faucet is safely in place, the supply pipelines can be connected to the tails of the faucets. The taps can either be attached by using corrugated copper piping or with normal faucet connectors. The previous type needs to be connected to the faucet ends initially, tightening just by hand. The supply pipes can later on be linked to the various other end. Tighten both ends with a spanner after both ends have actually been linked.

    Tiling Around the Bath tub


    In the area where the bathroom satisfies the floor tile, it is required to secure the joins with a silicone rubber caulking. This is necessary as the fitting can relocate sufficient to break an inflexible seal, creating the water to permeate the wall surface between the bathroom and the tiling, causing complications with moisture and also possible leakages to the ceiling below.
    You can select from a selection of coloured sealants to assimilate your components and installations. They are sold in tubes as well as cartridges, and also are capable of sealing voids up to a width of 3mm (1/8 inch). If you have a bigger gap to fill up, you can load it with twists of soaked paper or soft rope. Remember to always fill up the bath tub with water before sealing, to permit the movement experienced when the tub remains in use. The sealant can split rather early if you do not take into consideration this activity before sealing.
    Additionally, ceramic coving or quadrant floor tiles can be used to edge the bathroom or shower tray. Plastic strips of coving, which are easy to use and also cut to size, are likewise conveniently readily available on the market. It is recommended to fit the ceramic tiles making use of waterproof or waterproof sticky as well as cement.

    A Step-by-Step Guide to Installing a Bathtub


    Is your bathtub looking a bit dated lately? Believe it or not, installing a new one is a project you can do yourself. Whether your bathtub is broken or doesn’t fit in with your current bathroom’s design, you can fix it without having to hire a contractor or paying labour costs.



    But, beyond saving money, there are other benefits of installing your own bathtub. When you do this project yourself, you can customise every step of the process. You can also make sure the finished product looks exactly the way you want it to.



    This DIY project is quite involved, but by doing some research, preparing your bathroom and using the right equipment, it is definitely one you can take on. This guide will help you understand the technical procedures behind installing a new bathtub.


    Remove the Existing Bathtub


    To remove the old bathtub, you will need to turn the water supply off before you start any work. After you turn the water off, there will likely still be some water left in your plumbing system, which you can remove by turning on a faucet below the level of the bathtub. Once the water stops running, you are ready to start working.



    The easiest way to remove the tub is to remove the faucet, handles and other piping and then pull the tub out from the wall. If this doesn’t work in your situation, you will need to remove part of the wall, remove the piping and then slide the tub out.


    Choose the Right Bathtub


    The ideal way to replace your bathtub is to find one that has the exact dimensions and has the drain and faucet on the same side as your old one. This way, it will fit in the same place and you won’t have to change the piping system in your bathroom. Choose a tub that matches your home’s decor and fits with the style of the bathroom.


    Install the Plumbing and Ledger Board


    You can purchase a tub drain kit at a hardware store which will have all the pieces you will need for your new tub’s plumbing. Follow the instructions that came with the kit to install the plumbing in the new tub and then take measurements to make sure the plumbing in the tub will align with the plumbing in your bathroom. If it doesn’t, now is the time to make necessary adjustments.



    Some bathtubs need a ledger board that is installed on the wall behind the tub to help support it. If your new bathtub requires one, the directions that came with it will tell you how high it should be installed. If your old bathtub had a ledger board, and it is still in good condition, you can adjust its height to match the new bathtub.


    Install the Bathtub


    When the plumbing and ledger board are ready, you can install the new bathtub. Carefully lower it into the space, being careful not to damage the tub, wall, plumbing or ledger board. Since bathtubs are very heavy and you will need to line the tub up exactly, it is wise to have someone help you with this step.



    Once the tub is in place, it needs to be perfectly level, so use a bubble level instead of estimating how level the tub is. Put the level on the top edge of the tub, not the bottom on the inside, since many tubs are designed with a sloped bottom.



    If the bathtub isn’t level, adjust the ledger board and shift the tub until it is. When it is level, use screws to attach the tub to the wall studs. Most bathtubs have pre-drilled holes in the upper flange, so use these but do not over tighten the screws.


    Hook up the Plumbing


    Now that the bathtub is installed, it needs to be attached to your plumbing system. First, install the shoe fitting under the tub and drain pipe, then the overflow pipe and then the drain flange. Your tub plumbing kit will include specific instructions on how to install these pieces.


    Install the Bathtub Surround


    A bathtub surround will protect the walls around the tub from water damage and can give your new bathtub a more finished look. To install one, make sure the wall is completely clean and dry so that the adhesive will be able to hold the surround securely. Then, measure the surround and mark the same dimensions on the wall above the tub.



    Following the directions that came with the surround adhesive, apply it to the wall. Press the surround against the wall on top of the adhesive and then pull it away for about three minutes to activate the adhesive, then apply the surround again. Keep in mind that this is the most common way to use an adhesive, but you should check the instructions on the package for any special steps.



    If there is any excessive adhesive around the sides of the surround, you can use mineral spirits to remove it. Then use masking tape to hold the surround panels in place until the adhesive is dry. Using silicone, seal all the cracks between the surround panels and the gap between the bottom of the panels and the top of the bathtub.



    If you want to install tile above your bathtub, instead of a bathtub surround, the process will be very similar. But, you will need to measure and cut tiles and install each one individually, using tile spacers to make sure they are evenly spaced. You will then use grout to fill in the spaces between the tiles.

    https://www.hss.com/blog/bathroom/a-step-by-step-guide-to-installing-a-bathtub/


    How to Install a Bathtub

    Hopefully you enjoyed our excerpt about How to Install a Bathtub: Install an Acrylic Tub and Tub Surround. Thanks for spending some time to read through our short article. Enjoyed our posting? Please share it. Let someone else discover it. Thanks a lot for your time. Don't forget to come by our blog back soon.




    See Availability


    Leave a Reply

    Your email address will not be published. Required fields are marked *